CCNA troubleshooting tickets lab 2 of 12
Interfaces and cabling across two floors
A router swap and a desk move have left two floors of an office without a network. Use interface status, CDP and the MAC address table to find which cable is really where, fix three faults, and test a suggested fix that would only hide one of them.
Run this lab
It needs Lite: its 6 nodes are set to 6 vCPU and 6,144 MB in total. It is ready about 4 minutes after you start it. It starts already set up, with nothing to paste before the first task. It fits the free demo too.
In your workspace: Shared, then CCNA 200-301 troubleshooting tickets, then 02 - Interfaces and cabling across two floors
Try it free for 30 minutesRun it on Lite from £3 a day
- About 4 min to be ready
- About 40 min of tasks
- The free demo’s 30 min cover the start and about 26 min of the tasks
- Level
- Beginner
- How you work
- CLI-led
- Nodes need
- 6 vCPU, 6,144 MB
- Smallest plan
- Lite
The scenario
Marsh & Daughters, a small architects' practice, has two floors. Last night a contractor replaced the router, and this morning PC3's owner moved to a new desk. Three tickets arrived before nine. The cabling record below is what the contractor handed over: treat it as a claim to check, not as fact.
| Ticket | From | Reported |
|---|---|---|
| INC-0201 | Reception, floor 1 (PC1) | "Nothing works since the new router went in. We can't even reach the router." |
| INC-0202 | PC2, floor 2 | "My link light is on, but I can't reach anything." |
| INC-0203 | PC3, floor 2 | "I moved to desk 2.02 this morning and I've got no network. The record says I'm on SW2 Gi1/1." |
Cabling record (contractor's)
| From | Port | To | Port |
|---|---|---|---|
| R1 | Gi0/2 | SW1 | Gi0/0 |
| SW1 | Gi0/1 | SW2 | Gi0/1 (riser trunk) |
| SW1 | Gi1/0 | PC1 | |
| SW2 | Gi1/0 | PC2 | |
| SW2 | Gi1/1 | PC3 |
Design: one office VLAN, VLAN 10 STAFF, 10.2.10.0/24, with R1 as the gateway on 10.2.10.1. The riser between the floors is an 802.1Q trunk. PC ports are PortFast edge ports in VLAN 10. VLAN 20 belonged to CCTV cameras that have been removed.
Topology: R1 above SW1 (floor 1); SW1's riser to SW2 (floor 2); PC1 on SW1, PC2 and PC3 on SW2. The canvas shows the real cables.
Start-up and waits: click Start all. The PCs are ready at once, the switches in about 2 to 3 minutes and the router in about 3 (up to 7 on a busy host). Consoles open at R1> or SW1>; enable has no password. Read each switch's log as it starts: it already holds a clue. Everything is configured at boot, so there's nothing to paste. A node you stop and start keeps only what was saved. If a PC's console shows garbled characters just above Executing the startup file, stop and start that PC: now and then a virtual PC starts unable to send.
How it's marked: each ticket has points for the end state you can prove with show commands and pings. Check your work lists the proof for each point, and a closed ticket scores even if another stays open.
Rules: you can't move cables (the building is closed for the contractor). Fix everything in configuration, and correct the cabling record on paper.
What you’ll practise
- Read interface and line-protocol status, and find err-disabled ports and their cause
- Validate a cabling record against CDP and the MAC address table
- Fix an access port and a router interface without moving a cable
- Reject a fix that hides a fault instead of removing it
The tasks
- Ticket INC-0201: "We can't even reach the router" (3 points)
- Ticket INC-0202: "My link light is on, but I can't reach anything" (3 points)
- Ticket INC-0203: "I moved desks and I've got no network" (3 points)
- Verify the suggested fix (2 points)
The Lab Tasks pane has the scenario, these tasks, the checks to run, hints and the full solution.
Topology and devices
The network as it opens in EVE-NG, drawn from the lab’s own canvas, and the image each node runs.
Every link, as text
- R1
Gi0/1to SW1Gi0/0 - SW1
Gi0/1to SW2Gi0/1 - SW1
Gi1/0to PC1eth0 - SW2
Gi1/0to PC2eth0 - SW2
Gi1/2to PC3eth0
| Node | Device | Image in Add Node | Set to |
|---|---|---|---|
| R1 | Cisco IOSv | vios-adventerprisek9-m.SPA.159-3.M6 | 1 vCPU, 1,024 MB |
| SW1 | Cisco IOSvL2 | viosl2-adventerprisek9-m.ssa.high_iron_20200929 | 1 vCPU, 1,024 MB |
| SW2 | Cisco IOSvL2 | viosl2-adventerprisek9-m.ssa.high_iron_20200929 | 1 vCPU, 1,024 MB |
| PC1 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
| PC2 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
| PC3 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
How to open this lab
Sign in to your workspace at
lab.cloudlabbox.com.In File Manager, open Shared, then the folder
CCNA 200-301 troubleshooting tickets.Open
02 - Interfaces and cabling across two floorsand start its nodes, then open Lab Tasks for the scenario and the steps.
The lab is read-only. You can start the nodes and configure the devices, but changes to the topology can’t be saved. To change it, rebuild it in your own folder.
More CCNA troubleshooting tickets labs
All CCNA troubleshooting tickets labs
Related labs in other courses
CloudLabBox is independent of Cisco. The lab follows exam topics and isn’t vendor training material; vendor names identify the exams and the images in the workspace.