CCNA troubleshooting tickets lab 5 of 12

VLANs, trunks and EtherChannel in a two-building campus

Two buildings, a core switch, a router on a stick and three tickets: a lab VLAN that never reaches building B, a new starter's PC on the wrong VLAN and a monitoring alert for a broken EtherChannel. Fix them without opening up VLANs the design keeps pruned.

Run this lab

It needs Standard: its 7 nodes are set to 7 vCPU and 7,168 MB in total. It is ready about 8 minutes after you start it. It starts already set up, with nothing to paste before the first task.

In your workspace: Shared, then CCNA 200-301 troubleshooting tickets, then 05 - VLANs trunks and EtherChannel in a two-building campus

Run it on Standard from £5 a day

  • About 8 min to be ready
  • About 50 min of tasks

The free demo isn’t offered for this lab: it is Lite size, with 6 vCPU and 8 GB, and this lab’s nodes need 7 vCPU and 7,168 MB together. Every lab plan includes every guided lab.

Level
Intermediate
How you work
CLI-led
Nodes need
7 vCPU, 7,168 MB
Smallest plan
Standard

The scenario

Halton Sixth Form College has two buildings. Building A's access switch (ASW1) joins the core (DSW1) over a two-link EtherChannel, and building B's (ASW2) over a single trunk. R1 routes between the staff and lab VLANs on a router-on-a-stick trunk. A contractor "standardised" the switch configurations over half term.

TicketFromReported
INC-0501Building B science lab (PC2)"The lab PCs have had no network since half term."
INC-0502Building B, new starter (PC3)"My PC can't reach anything. My colleague in building A is fine."
INC-0503Monitoring"DSW1 Port-channel1 is down. Building A's uplink has no redundancy."

Design:

ItemDesign
VLANs10 STAFF 10.5.10.0/24, 20 LAB 10.5.20.0/24, 99 NATIVE (unused, native on every trunk); gateways are R1's subinterfaces, .1
Trunks802.1Q, set statically, native VLAN 99, allowed VLANs exactly 10, 20 and 99 on every trunk
Building APo1, Gi0/1 and Gi0/2 on both DSW1 and ASW1, LACP
Building BASW2 Gi0/1 to DSW1 Gi0/3, single trunk
Spanning treeRapid PVST+, DSW1 is root for every VLAN
HostsPC1 10.5.10.10 (STAFF, ASW1 Gi1/0), PC2 10.5.20.10 (LAB, ASW2 Gi1/0), PC3 10.5.10.30 (STAFF, ASW2 Gi1/1)

Topology: R1 at the top, DSW1 below it, ASW1 (building A) on DSW1's Gi0/1 and Gi0/2, ASW2 (building B) on DSW1's Gi0/3.

Start-up and waits: click Start all. The switches take about 2 to 3 minutes and the router about 3 (up to 7 on a busy host); the PCs are ready at once. Consoles open at >, and enable has no password. Everything is configured at boot, faults included, so there's nothing to paste. A node you stop and start keeps only what was saved. If a PC's console shows garbled characters just above Executing the startup file, stop and start that PC: now and then a virtual PC starts unable to send.
How it's marked: points for the end state you can prove with show commands and pings; see Check your work.

Rules: keep the design's VLAN pruning. Fix each fault where it is.

What you’ll practise

  • Follow a VLAN from access port to trunk to router and find where it stops
  • Read trunk allowed lists, VLAN states and access-port membership
  • Troubleshoot an EtherChannel whose two ends negotiate with different protocols
  • Reject a fix that works by removing the design's VLAN pruning

The tasks

  1. Ticket INC-0501: "The lab PCs have had no network since half term" (4 points)
  2. Ticket INC-0502: "My PC can't reach anything" (2 points)
  3. Ticket INC-0503: "Port-channel1 is down" (3 points)
  4. Verify the suggested fix (2 points)

The Lab Tasks pane has the scenario, these tasks, the checks to run, hints and the full solution.

Topology and devices

The network as it opens in EVE-NG, drawn from the lab’s own canvas, and the image each node runs.

Topology of VLANs trunks and EtherChannel in a two-building campus7 nodes, 7 links. Every link is listed as text below the diagram.R1DSW1ASW1ASW2PC1PC2PC3Gi0/0Gi0/0Gi1/0eth0Gi1/0eth0Gi1/1eth0Gi0/1Gi0/1Gi0/2Gi0/2Gi0/3Gi0/1
7 nodes, with the interface names each link uses. On a narrow screen, scroll the diagram sideways.
Nodes in VLANs, trunks and EtherChannel in a two-building campus, with the image each runs and the vCPU and RAM it’s set to
NodeDeviceImage in Add NodeSet to
R1Cisco IOSvvios-adventerprisek9-m.SPA.159-3.M61 vCPU, 1,024 MB
DSW1Cisco IOSvL2viosl2-adventerprisek9-m.ssa.high_iron_202009291 vCPU, 1,024 MB
ASW1Cisco IOSvL2viosl2-adventerprisek9-m.ssa.high_iron_202009291 vCPU, 1,024 MB
ASW2Cisco IOSvL2viosl2-adventerprisek9-m.ssa.high_iron_202009291 vCPU, 1,024 MB
PC1VPCS hostBuilt in to EVE-NGCounted as 1 vCPU, 1,024 MB
PC2VPCS hostBuilt in to EVE-NGCounted as 1 vCPU, 1,024 MB
PC3VPCS hostBuilt in to EVE-NGCounted as 1 vCPU, 1,024 MB

How to open this lab

  1. Sign in to your workspace at lab.cloudlabbox.com.

  2. In File Manager, open Shared, then the folder CCNA 200-301 troubleshooting tickets.

  3. Open 05 - VLANs trunks and EtherChannel in a two-building campus and start its nodes, then open Lab Tasks for the scenario and the steps.

The lab is read-only. You can start the nodes and configure the devices, but changes to the topology can’t be saved. To change it, rebuild it in your own folder.

More CCNA troubleshooting tickets labs

All CCNA troubleshooting tickets labs

Related labs in other courses

CloudLabBox is independent of Cisco. The lab follows exam topics and isn’t vendor training material; vendor names identify the exams and the images in the workspace.