Network+ lab 27 of 27
Capstone: build a secure branch office from a work order
Build a complete branch network from a written work order, with no step-by-step instructions: VLANs and a hardened trunk, router-on-a-stick, DHCP, PAT to the internet, guest isolation, SSH management, time and logging, and switch port security. Checkpoints tell you when each part works.
Run this lab
It needs Lite: its 6 nodes are set to 6 vCPU and 4,352 MB in total. That fits the free demo too.
In your workspace: Shared, then CompTIA Network Plus N10-009 guided labs, then 27 - Capstone - build a secure branch office from a work order
- Level
- Advanced
- Time
- About 120 minutes
- Nodes need
- 6 vCPU, 4,352 MB
- Smallest plan
- Lite
The scenario
Harbour Logistics is opening a depot in Felixstowe. The ISP router is live, the kit is racked and cabled, and the devices hold nothing but their names. You have the work order below and the rest of the day. Unlike earlier labs, the tasks say what to achieve, not how: use what you've learned. Work through the checkpoints in order; each one proves a layer before you build on it.
Work order WO-2026-118: Felixstowe depot network
| VLAN | Name | Subnet | Gateway (R1) | Addressing | SW1 ports |
|---|---|---|---|---|---|
| 10 | STAFF | 10.40.10.0/24 | .1 | DHCP .100–.254 | Gi0/1 (PC1) |
| 30 | GUEST | 10.40.30.0/24 | .1 | DHCP .100–.254 | Gi0/2 (PC2) |
| 50 | SERVERS | 10.40.50.0/24 | .1 | static (SRV1 .10) | Gi0/3 (SRV1) |
| 99 | MGMT | 10.40.99.0/24 | .1 | SW1 is .2 | none (SVI only) |
| 999 | PARKING | none | none | none | unused ports, native VLAN |
Requirements
- Switching: SW1 Gi0/0 is an 802.1Q trunk to R1, DTP off, native VLAN 999, allowing only 10, 30, 50 and 99. User ports are access ports with PortFast and BPDU guard. Gi1/0–Gi1/3 are shut and placed in VLAN 999.
- Routing: R1 routes the four VLANs with router-on-a-stick subinterfaces and has a default route to the ISP (198.51.100.1). SW1 is managed on 10.40.99.2 with R1 as its default gateway. SW1 runs as a layer 2 switch (its start-up configuration already has
no ip routing). - DHCP: R1 serves STAFF and GUEST (exclude .1–.99), with gateway .1, DNS server 203.0.113.1 and domain
felixstowe.harbour.lab. - Internet: all four VLANs reach the internet through PAT on R1's outside interface Gi0/1.
- Guests: the guest VLAN reaches the internet only, nothing in 10.0.0.0/8 (DHCP must still work).
- Management: SSH v2 only on R1 and SW1, local user
admin/Harb0ur-Adm1nat privilege 15, enable secretHarb0ur-Enable, domainharbour.lab. Only the MGMT and STAFF subnets may open management sessions. - Operations: R1 takes time from the ISP (198.51.100.1) and SW1 from R1. Both send syslog to SRV1 (10.40.50.10).
- Port security: PC1's port allows at most 2 MAC addresses, learned as sticky addresses, and restricts violators (drops and logs, doesn't shut).
What you’ll practise
- Turn a work order into a configuration plan
- Build VLANs, a trunk and inter-VLAN routing for four networks
- Provide DHCP, NAT/PAT and a default route to the internet
- Isolate guests with an ACL while keeping DHCP working
- Secure management with SSH, local accounts and an access class
- Add NTP, syslog, port security and parked unused ports, then verify end to end
The tasks
- Bring up the server
- Plan before you type
- Layer 2 (requirement 1)
- Layer 3 (requirement 2)
- DHCP and the internet (requirements 3 and 4)
- Guest isolation (requirement 5)
- Secure management (requirement 6)
- Operations and port security (requirements 7 and 8)
- Verify like an auditor
The Lab Tasks pane has the scenario, these tasks, the checks to run, hints and the full solution.
Topology and devices
The network as it opens in EVE-NG, drawn from the lab’s own canvas, and the image each node runs.
Every link, as text
- ISP
Gi0/0to R1Gi0/1 - R1
Gi0/0to SW1Gi0/0 - SW1
Gi0/1to PC1eth0 - SW1
Gi0/2to PC2eth0 - SW1
Gi0/3to SRV1eth0
| Node | Device | Image in Add Node | Set to |
|---|---|---|---|
| ISP | Cisco IOSv | vios-adventerprisek9-m.SPA.159-3.M6 | 1 vCPU, 512 MB |
| R1 | Cisco IOSv | vios-adventerprisek9-m.SPA.159-3.M6 | 1 vCPU, 512 MB |
| SW1 | Cisco IOSvL2 | viosl2-adventerprisek9-m.ssa.high_iron_20200929 | 1 vCPU, 768 MB |
| PC1 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
| PC2 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
| SRV1 | Alpine Linux | clbalpinebase-alpine-base-3-20-3 | 1 vCPU, 512 MB |
How to open this lab
Sign in to your workspace at
lab.cloudlabbox.com.In File Manager, open Shared, then the folder
CompTIA Network Plus N10-009 guided labs.Open
27 - Capstone - build a secure branch office from a work orderand start its nodes, then open Lab Tasks for the scenario and the steps.
The lab is read-only. You can start the nodes and configure the devices, but changes to the topology can’t be saved. To change it, rebuild it in your own folder.
More Network+ labs
Related labs in other courses
CloudLabBox is independent of CompTIA, Cisco and Netgate. The lab follows exam topics and isn’t vendor training material; vendor names identify the exams and the images in the workspace.