HCIA-Datacom lab 20 of 22
Troubleshooting a switched network
A colleague's change left the Northwind floor half broken. Three tickets, four hidden faults: you work from symptoms to causes with a layered method, using display commands rather than guesses, and fix each fault without breaking anything else.
Run this lab
It needs Standard: its 6 nodes are set to 9 vCPU and 9,216 MB in total.
In your workspace: Shared, then HCIA-Datacom H12-811 guided labs, then 20 - Troubleshooting a switched network
- Level
- Advanced
- Time
- About 60 minutes
- Nodes need
- 9 vCPU, 9,216 MB
- Smallest plan
- Standard
The scenario
Last night a contractor "tidied up" the configuration of Northwind's switches. This morning the helpdesk has three tickets:
- Ticket 1: PC1 (Finance, on SW2) can't reach anything, not even its gateway.
- Ticket 2: PC2 (Sales, on SW3) can't reach its gateway.
- Ticket 3: PC3 (Finance, on SW3) can't reach its gateway either, though it worked yesterday.
The design hasn't changed:
- Finance is VLAN 10 (192.168.10.0/24) and Sales is VLAN 20 (192.168.20.0/24). Both gateways are .254, on SW1's VLANIFs.
- SW1 and SW2 are joined by Eth-Trunk1 in LACP mode. Today it has one member, GE1/0/2; a second link is on order, and the bundle is ready for it.
- SW1 and SW3 are joined by an 802.1Q trunk on GE1/0/1 carrying VLANs 10 and 20 (not VLAN 1).
- The PCs' own settings are correct: don't change them.
There are four faults in total. Some tickets have more than one cause.
What you’ll practise
- Apply a structured troubleshooting method: define the problem, gather facts, isolate by layer, fix, verify
- Find VLAN membership, trunk allowed-list and Eth-Trunk negotiation faults from display output
- Spot a gateway subnet-mask mistake from ARP and routing behaviour
- Document each fault and its fix
The tasks
- Load the broken network
- Ticket 2 (PC2, Sales)
- Ticket 3 (PC3, Finance on SW3)
- Ticket 1 (PC1, Finance on SW2)
- Prove everything and write it up
The Lab Tasks pane has the scenario, these tasks, the checks to run, hints and the full solution.
Topology and devices
The network as it opens in EVE-NG, drawn from the lab’s own canvas, and the image each node runs.
Every link, as text
- SW1
GE1/0/2to SW2GE1/0/2 - SW1
GE1/0/1to SW3GE1/0/1 - SW2
GE1/0/10to PC1eth0 - SW3
GE1/0/11to PC2eth0 - SW3
GE1/0/10to PC3eth0
| Node | Device | Image in Add Node | Set to |
|---|---|---|---|
| SW1 | Huawei CloudEngine CE6800 | huaweice6800-bundled | 2 vCPU, 2,048 MB |
| SW2 | Huawei CloudEngine CE6800 | huaweice6800-bundled | 2 vCPU, 2,048 MB |
| SW3 | Huawei CloudEngine CE6800 | huaweice6800-bundled | 2 vCPU, 2,048 MB |
| PC1 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
| PC2 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
| PC3 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
How to open this lab
Sign in to your workspace at
lab.cloudlabbox.com.In File Manager, open Shared, then the folder
HCIA-Datacom H12-811 guided labs.Open
20 - Troubleshooting a switched networkand start its nodes, then open Lab Tasks for the scenario and the steps.
The lab is read-only. You can start the nodes and configure the devices, but changes to the topology can’t be saved. To change it, rebuild it in your own folder.
More HCIA-Datacom labs
Related labs in other courses
CloudLabBox is independent of Huawei. The lab follows exam topics and isn’t vendor training material; vendor names identify the exams and the images in the workspace.