HCIA-Datacom lab 22 of 22
Capstone - build a small campus network
Design and build Northwind's new office from factory defaults, following the campus method of requirements, design, implementation, verification and operations. Access and core switching, VLANIF gateways, OSPF, internet access with NAT, secure management and monitoring all come together, with design checkpoints for WLAN and the data centre.
Run this lab
It needs Standard: its 6 nodes are set to 8 vCPU and 10,240 MB in total.
In your workspace: Shared, then HCIA-Datacom H12-811 guided labs, then 22 - Capstone - build a small campus network
- Level
- Advanced
- Time
- About 120 minutes
- Nodes need
- 8 vCPU, 10,240 MB
- Smallest plan
- Standard
The scenario
Northwind is opening a new office, and you are the network engineer. Everything except the ISP router arrives in its factory state. Work through Huawei's campus method:
- Requirements: given below.
- Design: you complete it in Task 1.
- Implementation: Tasks 2–6.
- Verification: Task 7.
- Operations: Task 8.
What you’ll practise
- Turn requirements into VLAN, IP and device-role plans
- Build access and core layers: VLANs, an LACP uplink, RSTP with edge ports and BPDU protection, VLANIF gateways
- Route the campus to the egress router with OSPF and a default route, and reach the internet through Easy IP
- Secure and monitor the network: SSH-only management, a VTY ACL, SNMP and LLDP
- Verify end to end and explain how WLAN and data-centre designs would extend the campus
The tasks
- The ISP's side
- Design
- Access layer (SW2)
- Core layer (SW1)
- Routing (SW1 and R1)
- Internet access (R1)
- Secure management and monitoring
- Verification
The Lab Tasks pane has the scenario, these tasks, the checks to run, hints and the full solution.
Topology and devices
The network as it opens in EVE-NG, drawn from the lab’s own canvas, and the image each node runs.
Every link, as text
- SW2
GE1/0/2to SW1GE1/0/2 - SW1
GE1/0/1to R1GE0/0/0 - R1
GE0/0/1to ISPGE0/0/0 - SW2
GE1/0/10to PC1eth0 - SW2
GE1/0/11to PC2eth0
| Node | Device | Image in Add Node | Set to |
|---|---|---|---|
| SW1 | Huawei CloudEngine CE6800 | huaweice6800-bundled | 2 vCPU, 2,048 MB |
| SW2 | Huawei CloudEngine CE6800 | huaweice6800-bundled | 2 vCPU, 2,048 MB |
| R1 | Huawei AR1000V router | huaweiar1k-5.170-V300R022C00SPC100-Auto-update-esn | 1 vCPU, 2,048 MB |
| ISP | Huawei AR1000V router | huaweiar1k-5.170-V300R022C00SPC100-Auto-update-esn | 1 vCPU, 2,048 MB |
| PC1 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
| PC2 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
How to open this lab
Sign in to your workspace at
lab.cloudlabbox.com.In File Manager, open Shared, then the folder
HCIA-Datacom H12-811 guided labs.Open
22 - Capstone - build a small campus networkand start its nodes, then open Lab Tasks for the scenario and the steps.
The lab is read-only. You can start the nodes and configure the devices, but changes to the topology can’t be saved. To change it, rebuild it in your own folder.
More HCIA-Datacom labs
Related labs in other courses