CCNP ENCOR lab 6 of 36
Multiple Spanning Tree (MST)
Replace per-VLAN spanning trees with MST: one region, two instances that carry different VLANs on different uplinks, planned roots per instance, and a hands-on look at what happens at a region boundary.
Run this lab
It needs Lite: its 6 nodes are set to 6 vCPU and 5,120 MB in total. That fits the free demo too.
In your workspace: Shared, then CCNP ENCOR 350-401 guided labs, then 06 - Multiple Spanning Tree - MST
- Level
- Advanced
- Time
- About 60 minutes
- Nodes need
- 6 vCPU, 5,120 MB
- Smallest plan
- Lite
The scenario
Fernhill Freight plans to add dozens of VLANs to the warehouse block. With Rapid PVST+, every VLAN runs its own spanning tree with its own BPDUs and its own CPU cost, though only two different topologies are needed: "via DSW1" and "via DSW2". The design team has chosen MST (802.1s):
- Region FERNHILL, revision 1, on all four switches.
- MSTI 1: VLANs 10 and 99, root DSW1, backup root DSW2.
- MSTI 2: VLANs 20 and 30, root DSW2, backup root DSW1.
- The IST (instance 0, everything else) is rooted on DSW1.
The switches currently run Rapid PVST+ with default priorities, and the trunks carry all VLANs.
| Device | Links | Notes |
|---|---|---|
| DSW1 | Gi0/0 → DSW2, Gi0/1 → ASW1, Gi0/2 → ASW2 | SVIs 10.10.10.2, 10.10.20.2, 10.10.99.2 |
| DSW2 | Gi0/0 → DSW1, Gi0/1 → ASW1, Gi0/2 → ASW2 | Vlan99 10.10.99.3 |
| ASW1 | Gi0/1 → DSW1, Gi0/2 → DSW2, Gi1/0 → PC1 (VLAN 10) | Vlan99 10.10.99.11 |
| ASW2 | Gi0/1 → DSW1, Gi0/2 → DSW2, Gi1/0 → PC2 (VLAN 20) | Vlan99 10.10.99.12 |
| PC1 / PC2 | 10.10.10.10 / 10.10.20.10 | gateways on DSW1 (.2) |
Topology: the same square as lab 5. DSW1 and DSW2 are linked; each access switch has one uplink to each.
What you’ll practise
- Explain why MST maps many VLANs to a few spanning-tree instances
- Configure an MST region (name, revision, VLAN-to-instance map) consistently on every switch
- Place the root of the IST and of each MSTI
- Recognise a region boundary and the effect of a configuration mismatch
- Verify MST roles, costs and the configuration digest
The tasks
- Why MST?
- Define the region on every switch
- Place the roots
- Check the forwarding paths
- Break the region on purpose
The Lab Tasks pane has the scenario, these tasks, the checks to run, hints and the full solution.
Topology and devices
The network as it opens in EVE-NG, drawn from the lab’s own canvas, and the image each node runs.
Every link, as text
- DSW1
Gi0/0to DSW2Gi0/0 - DSW1
Gi0/1to ASW1Gi0/1 - DSW1
Gi0/2to ASW2Gi0/1 - DSW2
Gi0/1to ASW1Gi0/2 - DSW2
Gi0/2to ASW2Gi0/2 - ASW1
Gi1/0to PC1eth0 - ASW2
Gi1/0to PC2eth0
| Node | Device | Image in Add Node | Set to |
|---|---|---|---|
| DSW1 | Cisco IOSvL2 | viosl2-adventerprisek9-m.ssa.high_iron_20200929 | 1 vCPU, 768 MB |
| DSW2 | Cisco IOSvL2 | viosl2-adventerprisek9-m.ssa.high_iron_20200929 | 1 vCPU, 768 MB |
| ASW1 | Cisco IOSvL2 | viosl2-adventerprisek9-m.ssa.high_iron_20200929 | 1 vCPU, 768 MB |
| ASW2 | Cisco IOSvL2 | viosl2-adventerprisek9-m.ssa.high_iron_20200929 | 1 vCPU, 768 MB |
| PC1 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
| PC2 | VPCS host | Built in to EVE-NG | Counted as 1 vCPU, 1,024 MB |
How to open this lab
Sign in to your workspace at
lab.cloudlabbox.com.In File Manager, open Shared, then the folder
CCNP ENCOR 350-401 guided labs.Open
06 - Multiple Spanning Tree - MSTand start its nodes, then open Lab Tasks for the scenario and the steps.
The lab is read-only. You can start the nodes and configure the devices, but changes to the topology can’t be saved. To change it, rebuild it in your own folder.
More CCNP ENCOR labs
Related labs in other courses
CloudLabBox is independent of Cisco. The lab follows exam topics and isn’t vendor training material; vendor names identify the exams and the images in the workspace.